You will need a plot diagram/ design for ABP submission.
This is typically a 13-page document that contains the project blueprints of the project. It is common to find the following:
- Module Manufacturer
- Inverter Manufacturer
- Meter Manufacturer
- AC/DC sizing
- Count of the arrays with the location they were installed
- Array pitch and azimuth measurement
Comments
0 comments
Please sign in to leave a comment.