ABP & CSG Application Fees
Required: Application fee and 5% utility collateral is paid upfront either by the customer or installer. There are three options to choose from in section 1.7 of the CSG portal. The pricing bre...
-
ABP: What are the meter requirements?
System sizes 10kW and under do not require a Revenue Grade Meter. System sizes 10.1kW and above require a Revenue Grade Meter to be installed.
-
Can ABP project energization deadlines be extended?
Yes. Extensions will be granted for the following circumstances: 1. System is electrically complete due to utility approval An indefinite extension will be granted if a system is electrically co...
-
Why are we asking for a credit card?
CSG requires a credit card be held on file for under delivery purposes only. CSG will not charge the card on file for the upfront fees associated with the application process. If a collateral d...
-
How It Works: Collateral Drawdowns
The 5% utility collateral and 2.5% CSG collateral (if applicable) will be held for the 15 year contract term for SREC under delivery purposes. CSG will monitor the system on behalf of the utility...
-
What are the marketing requirements for installers?
You can access the ABP Guidebook Marketing Requirements here: DG Marketing Guidelines Updated 1.31.2019
-
Are co-located systems allowed?
In order to have two systems on the same parcel of land count as separate systems for the ABP they need to meet the requirements below. If they do not, they will need to be combined into one appli...
-
What are the requirements for battery backups?
All systems which include a battery shall be electrically connected in a manner which ensures that any non-solar generated electricity used to charge the battery is not later metered as solar gen...