Bethany Kirk created an article, Why are we asking for a credit card?
CSG requires a credit card be held on file for under delivery purposes only. CSG will not charge the card on file for the upfront fees associated with the application process. If a collateral d...
-
Bethany Kirk created an article, How It Works: Collateral Drawdowns
The 5% utility collateral and 2.5% CSG collateral (if applicable) will be held for the 15 year contract term for SREC under delivery purposes. CSG will monitor the system on behalf of the utility...
-
Bethany Kirk created an article, ABP & CSG Application Fees
Required: Application fee and 5% utility collateral is paid upfront either by the customer or installer. There are three options to choose from in section 1.7 of the CSG portal. The pricing bre...
-
Bethany Kirk created an article, What projects are exempt from prevailing wage?
ABP Residential Exemption If “Residential” is selected and the project is 25 kW AC or less in size, applicant will attest that the project is a residential project with a checkbox if it meets one o...
-
Bethany Kirk created an article, What are the requirements for prevailing wage?
A contractor or subcontractor is required to pay not less than the prevailing wage to all laborers, works, and mechanics engaged in the construction or demolition of public works. Construction mean...
-
Bethany Kirk created an article, What are the marketing requirements for installers?
You can access the ABP Guidebook Marketing Requirements here: DG Marketing Guidelines Updated 1.31.2019
-
Bethany Kirk created an article, Can ABP project energization deadlines be extended?
Yes. Extensions will be granted for the following circumstances: 1. System is electrically complete due to utility approval An indefinite extension will be granted if a system is electrically co...
-
Bethany Kirk created an article, ABP: What are the meter requirements?
System sizes 10kW and under do not require a Revenue Grade Meter. System sizes 10.1kW and above require a Revenue Grade Meter to be installed.
-
Bethany Kirk created an article, What are the requirements for battery backups?
All systems which include a battery shall be electrically connected in a manner which ensures that any non-solar generated electricity used to charge the battery is not later metered as solar gen...
-